Skip to Main Content
D-Tools System Integrator Ideas Portal
ADD A NEW IDEA

All ideas

4 Not supported for the current status

Replace Product options need Select All/none option for the checkboxes

No description provided
Guest 6 months ago in  0
2 Not supported for the current status

Project converted to Unit Based still adding products as Quantity Based

I have a project that I converted to a Unit Based project during the estimating process as we had to include shops with the proposal. However, as I am drawing schematics and adding items and packages, they are still coming into the project as Quan...
Guest 3 months ago in  0
19 Not supported for the current status

Proposal Expiration Date

With all the changes in today’s industry and most of us practicing a proposal only valid for x # days. it would be amazing to see a quote expiration date field in the proposal information setup that gets included in the standard reports cover page...
Guest about 2 years ago in  0
11 Not supported for the current status

Better Handling of Product Changes with Visio

I have run into several instances with SI recently where a project has changed due to CO or value engineering changes. Because drawings for submittal/approval were already done, this created an interesting wrinkle that I suspect is due to the proj...
Sandeep P. over 1 year ago in  0
7 Not supported for the current status

Add ability to include rendered PDF reports on workflow email notifications.

We would like to be able to build a workflow where when a project status is updated or a task or SO status is updated, that it could generate a PDF report of our choosing from the reports list.
Guest 10 months ago in  0
9 Not supported for the current status

Barcode Scanner to be added in the item receipt section so that it will be easy to document the item while receiving.

No description provided
Guest about 1 year ago in  0
5 Not supported for the current status

Integration with 3d softwares

Would be great to see this to have 3d softwares able to host list of BOQ from D-Tools like Sketch Up pro, Blender 3D, Vectorworks etc..
Guest 7 months ago in  0
2 Not supported for the current status

Middle Atlantic Rack Stencils

Does anyone know why MAP rack stencils act so screwy? If you load a basic WRK, or ERK, etc. and then set the rack size on the Shape Data tab, invariably it will be re-set when we re-open a drawing - nearly every time. Then the drawing and the devi...
Guest 3 months ago in  0
12 Not supported for the current status

Plant Machinery Booking/Tracking of internal tools

Able to track things like Core Drills, ladders etc and assign them to be picked or to an engineer. So we dont double book tools or if we do rent another in.
Guest over 1 year ago in  0
6 Not supported for the current status

Ability to mark products as physical or non-physical, so shipping can be calculated appropriately.

Our ERP (NetSuite) has the ability to invoice shipping as a percentage of the product cost. But it treats physical product differently than non-physical product (licenses, etc.). We need a way to have our D-Tools quote what will automatically be i...
Sandeep P. 9 months ago in  0